Description

Bottom 3 panes of glass had to be removed. The rotten section was cut out, it is usually the rail and both bottom sides of the stile, near the joint. New rail was installed with moulding to match the existing good part of the sash. Then the glass was glazed back to the repaired sash frame.

Before

After